Highlights:
- Resource estimate completed for the Almaden Project with 910,000 ounces gold grading 0.65 g/t gold in the indicated category and 160,000 ounces gold grading 0.56 g/t gold in the inferred category (Table 1);
- Historic drilling (70,234 m in 934 holes) and metallurgical test work comple ...
↧